Automated Assembly Lines
Scalable from people-assisted to fully automated. Designed around your product, your cycle time, and your facility — engineered and commissioned end-to-end from our facility.
Built for your product.
Not adapted
from a catalogue.
AT BUILD L is Artemis's platform for custom automated assembly lines. Every line is scoped, designed, and commissioned for a specific product — whether that's a 3-station semi-automatic jig line or a 10-station fully automated pallet conveyor system.
We design the mechanical structure, build the electrical panels, write the PLC and HMI software, integrate vision and measurement systems, and commission on your floor. One team, one contract, one point of accountability — from concept drawing to SAT sign-off.

Every AT BUILD L line includes
Poka-yoke & Part Verification
Sensor-confirmed part presence at every station. Barcode / QR / RFID scan for variant selection and traceability. No wrong-part escapes.
Torque-Controlled Fastening
Atlas Copco / Desoutter / Bosch Rexroth tooling integration. Every fastening event — torque value, angle, OK/NG — logged per serial number.
Machine Vision Inspection
Cognex / Keyence vision systems for component presence, orientation, solder joint, display pixel, and cosmetic inspection — integrated at the station.
Integrated Functional Test
AT DAQ S EOL test integrated inline — voltage, current, CAN/LIN, firmware programming, RF, and more. Assembly and test in a single line.
Full Traceability & MES Integration
Every assembly event — component serial, operator ID, station, time, all measurements — written to CSV/SQL. OPC-UA and REST API for MES/ERP connection.
Safety to ISO 13849
E-stop circuits, light curtains, two-hand controls, and safety-rated PLCs. Risk assessment and CE marking documentation provided on request.
AT BUILD L — standard configuration options
| Parameter | Specification / Range | Notes |
|---|---|---|
| Line configuration | 3 to 12 stations (standard). Larger on request. | Modular — stations can be added post-installation |
| Conveyor type | Flat belt, roller chain, slat chain, pallet conveyor | Pallet conveyor with RFID carrier tracking for full traceability |
| Throughput | Designed to customer's UPH target. Typical: 300–1,500 units/8-hr shift | Cpk targets agreed at scoping stage |
| Cycle time | From 15 seconds per unit (fully automated) to operator-paced (semi-auto) | Balancing study provided during engineering phase |
| Control system | Siemens S7-1200 / S7-1500, Mitsubishi iQ-R, Delta DVP, Allen-Bradley CompactLogix | Customer PLC platform preference accommodated |
| HMI | 7" to 21" colour touchscreen. Recipe management, production counters, OEE dashboard | Siemens WinCC / FactoryTalk / Weintek |
| Vision system | Cognex In-Sight, Keyence CV, Basler — integrated per station requirement | 2D and 3D options available |
| Data logging | Every cycle: serial number, timestamp, all process parameters, PASS/FAIL per station | Local SQL database + OPC-UA / REST API to MES/ERP |
| Footprint | Designed to customer's facility layout. CAD GA drawing provided at Gate G3 | Site survey conducted as part of proposal phase |
| Power supply | 3-phase 415V AC. 24V DC control circuit. UPS backup for data systems | Electrical single-line diagram included in engineering deliverables |
| Lead time | 8–14 weeks from BOM freeze (Gate G4) to FAT completion | SAT typically 2–4 weeks after FAT sign-off |
| Warranty | 12 months from SAT sign-off | AMC available from Year 2 |
How We Deliver Every Project
A proven 9-stage process refined over 500 projects — no surprises, no shortcuts.
Qualification
Consultation
Estimation
Kick-Off
Engineering
Fabrication
Integration &
Test
Acceptance
Test (FAT)
SAT &
Support
What sets an AT BUILD L line apart
- ✓ 100% in-house - mechanical, electrical, PLC software, and LabVIEW, one team, one contract. Core deliverables are never subcontracted.
- ✓ Fixed-price commitment - you pay for the outcome, not the hours. Scope changes managed formally, never silently absorbed into cost.
- ✓ We stay until SAT is signed - the line isn't delivered until it runs in your facility, to your numbers.
- ✓ A proven module library - reusable, field-tested sub-assemblies from 100+ delivered projects, for faster delivery and lower risk. you.
- ✓ Documentation and code stay with you - drawings, source code, and full documentation handed over, with AMC and spare parts available. No knowledge loss between delivery and support.
- ✓ At the heart of Pune's manufacturing belt - our Chinchwad MIDC facility sits in the centre of the region's automotive and electronics industry. Site visits always welcome.
Technology platforms we work with
Typical project profile
| Project value | Rs. 25 lakh – Rs. 2.5 Cr |
| Delivery timeline | 8–14 weeks from BOM freeze |
| Commercial model | Fixed price, milestone invoicing |
| Warranty | 12 months from SAT |
Tell us what you're assembling.
We'll tell you how to automate it.
Send us your product, your cycle time target, and your shift output requirement. We respond within 24 hours with a technical assessment — no obligation.
Or call us: +91 9028269123 · admin@artemistech.co.in